| | | | | | | | | | | | Networking
Our internal network
is completed wired with gigabit ethernet, and we also have gigabit connections to the
Hurricane Electric switches.
Rack Space
Hurricane Electric has been quickly expanding
their Fremont facility. This means that we can have virtually unlimited rack space at this location.
Power
Hurricane Electric provides one 15-amp circuit per rack. Because of this constraint, we often have
to consider a rack full before all of the cabinet space is used. To avoid power outages due to
tripping breakers, we consider the power on a rack to be completely used at 80% (12 amps). The cost
per rack is reasonable so obtaining an extra cabinet solely for more power is a reasonable compromise.